Education Hub
Our collection of media items to support your path towards electrical resiliency.
Industry
Industry
Categories
Category
[datacenter_tag_image]
- Hospitals & Healthcare Facilities
Huntsville Memorial Hospital replaced limited diesel backup with a 1.2 MW natural gas microgrid, gaining full-facility resilience through Entergy’s Power Through program.
[datacenter_tag_image]
- Data Centers
[datacenter_tag_image]
- Hospitals & Healthcare Facilities
Huntsville Community Hospital gained full-campus protection with utility-owned natural gas generators from Entergy Louisiana and Enchanted Rock without capital expense or added burden.
[datacenter_tag_image]
The Diesel Dilemma explores the risks, inefficiencies, and hidden costs of relying on diesel-fueled backup power for mission-critical operations, using a 500 MW data center to show how large-scale operations are impacted.
[datacenter_tag_image]
- Data Centers
[datacenter_tag_image]
The North Fort Bend County Water Authority (NFBWA) supplies surface water to combat land subsidence and preserve groundwater, delivering up to 19.5 million gallons daily. To ensure uninterrupted water service during power outages caused by severe weather, NFBWA partnered with Enchanted Rock to implement a clean, natural gas-powered microgrid for resilient backup power. This strategic collaboration guarantees reliable water access for residents and businesses, while reducing environmental impact and allowing NFBWA to focus on their mission.
[datacenter_tag_image]
Our RockBlock series is a high-performance, future-ready alternative to diesel that can fit diverse facility requirements for mission-critical operations. It is available from 1.5 to 3.5 MW capacities, with either Standard Low Emissions or CARB Ultra-Clean Emissions as well as an optional Reliability+ for added resilience.
[datacenter_tag_image]
Data centers are growing at record speed, but outdated solutions like diesel backup and delayed utility interconnections can’t keep up with AI-driven demand. In this white paper, energy expert Peter Asmus shows how onsite, flexible generation offers a faster, cleaner, and more affordable path forward—one that supports both uptime and the grid. Download now to see why Enchanted Rock’s approach is redefining how data centers secure sustainable, reliable power.