[datacenter_tag_image]
A rare-earth materials processing company that owns and operates the only operating mine and processing facility in the United States.
This client was seeking a low CAPEX option as they wanted to reallocate project budget to additional manufacturing equipment.
The client was in need of a back-up power solution but did not want to use diesel. The company needed a cleaner solution with a compact footprint to fit in their space-constrained generator yard.
Tentative deal close: Q2 2022
Project size: 4.8 MW Phase 1, 4.8 MW Phase 2
Enchanted Rock anticipates ~50MW of opportunity with client in the next 5 year at two sites including a mining and processing facility and a manufacturing facility